Our Projects
HUME LINK EAST
POWER INFRASTRUCTURE UPGRADE
Enacon Group is supporting the delivery of the HumeLink East transmission project, a key energy infrastructure initiative across regional New South Wales. The works include staged tower erection, transmission line installation, and associated civil and electrical activities across multiple zones.
Delivered in coordination with project partners and local authorities, the project incorporates robust traffic management, environmental controls, and safety measures to minimise impact. HumeLink East will strengthen the state’s energy network, improving reliability and supporting future demand.
Bathurst Regional Council
Rail Museum Substation
Enacon Group designed and constructed a three-phase substation pole to service the Rail Museum precinct. The project included street underboring, detailed service location mapping, and comprehensive traffic control to ensure public safety and minimise disruption.
Close coordination with Bathurst Regional Council and traffic management authorities enabled efficient delivery and full compliance with local infrastructure requirements. The outcome is a reliable, future-ready power supply supporting a key cultural and tourism asset within the Bathurst region.
O’Connell Rural Fire Service (RFS)
This critical infrastructure project involved the construction of a single-phase substation pole and transformer under Level 1 High Voltage regulations. Enacon Group delivered a complete end-to-end solution, including Level 2 underground supply to the switchboard with metering, as well as Level 3 design, engineering, and certification.
Delivered to support the O’Connell Rural Fire Service facility, the project strengthens local emergency response capabilities and highlights Enacon Group’s expertise in delivering essential infrastructure for frontline emergency service providers.
Teacher Housing Authority
Power Supply Upgrade (Trundle)
Enacon Group delivered a power infrastructure upgrade for the NSW Teacher Housing Authority in the rural township of Trundle. The project involved upgrading electrical supply systems to meet increasing demand and ensure long-term reliability across multiple residential properties.
By enhancing energy capacity and stability, the works support the housing needs of essential education staff in remote areas and demonstrate Enacon Group’s capability in delivering critical infrastructure upgrades across regional New South Wales.
Property NSW
Infrastructure Relocation
This project involved the relocation of power poles and electrical pillars for Property NSW. Key works included hydro-vac excavation of existing cables, inline cable jointing, and the replacement of road crossing cables. Enacon also provided full Level 3 design, engineering, and network certification. Working in a live electrical environment required precise planning, strict safety controls, and minimal service disruption. The project demonstrated Enacon’s capability in managing complex infrastructure modifications while maintaining full compliance with regulatory standards.
Blayney Shire Council
Network Upgrade
Enacon Group was engaged to deliver a new transformer and single-phase network extension for Blayney Shire Council. The project included the installation of High Voltage (HV) and Low Voltage (LV) earthing systems, underground power supply, and a new network pit. Completed in close consultation with council planners, this upgrade supports growing infrastructure demands in the region. The solution delivered long-term capacity and reliability while aligning with council development goals for the local community and future growth.